Affiliation:
1. Association of Universities for Research in Astronomy, Inc. (AURA), 1331 Pennsylvania Avenue NW, Suite 1475, Washington, DC 20004, USA
Abstract
More than 30 years have passed since the Voyager 2 flybys of Uranus and Neptune. This paper outlines a range of lessons learned from Voyager, broadly grouped into ‘process, planning and people.’ In terms of process, we must be open to new concepts, whether new instrument technologies, new propulsion systems or operational modes. Examples from recent decades that could open new vistas in the exploration of the deep outer Solar System include the Cassini Resource Exchange and the ‘sleep’ mode from the New Horizons mission. Planning is crucial: mission gaps that last over three decades leave much scope for evolution both in mission development and in the targets themselves. The science is covered in other papers in this issue, but this paper addresses the structure of the US Planetary Decadal Surveys, with a specific urging to move from a ‘destination-based’ organization to a structure based on fundamental science. Coordination of distinct and divergent international planning timelines brings both challenges and opportunity. Complexity in the funding and political processes is amplified when multiple structures must be navigated; but the science is enriched by the diversity of international perspectives, as were represented at the Ice Giant discussion meeting that motivated this review. Finally, the paper turns to people: with generational-length gaps between missions, continuity in knowledge and skills requires careful attention to people. Lessons for the next generation of voyagers include: how to lead and inspire; how to develop the perspective to see their missions through decades-long development phases; and cultivation of strategic thinking, altruism and above all, patience.
This article is part of a discussion meeting issue ‘Future exploration of ice giant systems’.
Subject
General Physics and Astronomy,General Engineering,General Mathematics
Reference14 articles.
1. Wesson R Porter D. 2007 The Cassini Resource Exchange. See https://appel.nasa.gov/2007/10/01/the-cassini-resource-exchange/.
2. Bitten RE Shinn SA Emmons DL. 2019 Challenges and Potential Solutions to Develop and Fund NASA Flagship Missions IEEE 978-1-5386-6854-2/19.
3. Wiseman J. 2015 The Hubble Space Telescope at 25: lessons learned for future missions . IAUGA 2258532 W. Paris France: IAU.
4. Mitchell D. 2015 An overview of NASA project management MAVEN magic and lessons learned . Washington DC: NASA.
5. Martin P. 2012 NASA's Challenges to Meeting Cost Schedule and Performance Goals. OIG Report IG-12-021. Alexandria VI Office of the Inspector General.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献