Author:
Mirabdali Seyed Saman,Soltani Reza
Abstract
Due to the importance of Information and Communication Technology (ICT) projects and lack of research on such projects in the petroleum industry, the present study mainly aimed to identify and prioritize the factors affecting the delay of ICT projects in Masjid-i-Solieman Oil and Gas Production Company as the case study. This investigation seeks the causes of undesirable conclusions of the ICT petroleum industry. The results are crucial to prevent the wastage of financial resources or time (due to sanctions and the difficulty of supply resources in Iran), also are very important for the project management of the oil and gas industry. On the other hand, it can be helpful all over the world.
According to the obtained prioritization, the most significant impact was the wrong sequence and definition of prerequisite relationships, prioritization instructions and lack of review of the priority in allocating limited resources to project components, and lack of timely allocation of financial resources, respectively, with the highest importance.
Reference22 articles.
1. Clancy, T. (2008). The Standish Group Report. Chaos report retrieved. from:
2. https://www.standishgroup.com/sample-research-files/Haze4.pdf.
3. Cheng, CH-Hsue, Lin, Y. (2002). Evaluating the best main battle tank using fuzzy decision theory with linguistic criteria evaluation. European Journal of Operational Research, 142(1): 174-186. https://doi.org/10.1016/S0377-2217(01)00280-6
4. Farughi H, Alaniazar S, Mousavipour S.H., Moradi V. (2017). A practical framework based on Fuzzy FMEA to diagnose causes of delay in construction projects. Journal of Industrial Management Studies. 15(45):145-175. [Persian]
5. Garcia-Quevedo, J, Segarra-Blasco, A, Teruel, M. (2018). Financial constraints and failure of innovation projects. Https://dx.doi.org/10.1016/j.techfore.2017.05.029