The Influence of Optimism Bias on Time and Cost on Construction Projects

Author:

Chadee AaronORCID,Hernandez Salisha R.,Martin Hector

Abstract

The unresolved scholarly debate to curtail cost and time performances in projects has led to alternate solutions, departing from the dominant technical school of thought to include concepts from behavioural sciences. In this paper, we consider the psychological effect, namely optimism bias, as one of the root causes for delays in cost overruns on projects. The research objectives were to determine the level of bias among project participants, rank time and cost overrun causes according to the participants’ bias score and establish a mitigation strategy to curb potential delays and cost overrun impacts based on the bias scores obtained. A literature survey was conducted to determine causal factors contributing to delays and cost overruns linked to optimism bias. Through a pilot survey of three semi-structured interviews, eighty factors obtained from the literature survey were reduced to 24 critical delay and cost overrun factors relevant to Trinidad and Tobago. A questionnaire was subsequently developed seeking construction professionals to rate their bias scores based on an 11-point Likert scale. The research confirms that project planners and decision-makers exhibit moderate levels of optimism bias; however, participants lacked awareness of the impact of optimism bias on projects outcomes. Project location, environmental impacts and historic preservation, and labour disputes are the top three critical factors where project professionals displayed increased optimistic tendencies. It is proposed that contingency “time window” and reference class forecasting be implemented as control mechanisms to mitigate the impacts of time and cost overruns on projects. This research introduces a novel method to account for and measure optimism bias on construction projects. This study adds knowledge into delays and cost overruns causation and provides a foundation for future studies on quantifying psychological effects on projects and enhancing overall project management practices. Doi: 10.28991/esj-2021-01287 Full Text: PDF

Publisher

Ital Publication

Subject

Multidisciplinary

Cited by 10 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3