Evaluating the Existing Barriers in Implementing Constructability

Author:

Jadidoleslami Samereh,Saghatforoush Ehsan,Heravi Amirhossein,Preece Christopher

Abstract

In fact, constructability is facilitating the construction of a project through integrating knowledge and experience to achieve the overall and common objectives of the project in all stages of it, but practically there is still a significant gap between design, construction, and achieving the desired project objectives. Studies show that separating the design and construction processes and lack of presence of the contractor in the design stage, prevent the effective use of experiences and specialty of the contractor to improve and develop design processes. This issue results in increasing project time and cost, poor relationships, and also increasing project waste and duplication. The barriers to implementing this concept can have major differences with each other in different locations all over the world, due to the unity of the executive conditions in various countries. This paper evaluates the existing practical barriers to implementation of constructability in the construction industry. A comprehensive literature review has been performed by the authors through using the Meta-Synthesis method and findings were used to form research assumptions. Three case studies of Mass Housing project (MHP) in Tehran were instigated. Outputs taken from nine interviews with different experts in this industry working in diverse areas, including owners, consultants and contractors are then ranked after theoretical saturation compared using the NVIVO Software and through pattern and descriptive analyses. The concept of constructability is focused on the early presence of contractors in the initial stages of the project. So that, through integrating knowledge and experience, problems due to lack of their presence in the early stages of the project can be reduced. Comparing the existing barriers to implementing constructability in Iran with those of the wider world, presents some effective solutions to facilitate the presence of the construction contractors in the early stages of projects.

Publisher

Ital Publication

Subject

Geotechnical Engineering and Engineering Geology,Building and Construction,Civil and Structural Engineering,Environmental Engineering

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3