Author:
Agbede O.A,Aiyelokun Oluwatobi
Abstract
Of all natural disasters, floods have been considered to have the greatest potential damage. The magnitude of economic damages and number of people affected by flooding have recently increased globally due to climate change. This study was based on the establishment of a stochastic model for reducing economic floods risk in Yewa sub-basin, by fitting maximum annual instantaneous discharge into four probability distributions. Daily discharge of River Yewa gauged at Ijaka-Oke was used to establish a rating curve for the sub-basin, while return periods of instantaneous peak floods were computed using the Hazen plotting position. Flood magnitudes were found to increase with return periods based on Hazen plotting position. In order to ascertain the most suitable probability distribution for predicting design floods, the performance evaluation of the models using root mean square error was employed. In addition, the four probability models were subjected to goodness of fit test besed on Anderson-Darling (A2) and Kolmogorov-Smirnov (KS). As a result of the diagnostics test the Weibul probability distribution was confirmed to fit well with the empirical data of the study area. The stochastic model generated from the Weibul probability distribution, could be used to enhance sustainable development by reducing economic flood damages in the sub-basin.
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction,Civil and Structural Engineering,Environmental Engineering
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献