Rationalizing Critical Cost Overrun Factors on Public Sector Housing Programmes

Author:

Chadee Aaron AnilORCID,Martin Hector Hugh,Mwasha Abrahams,Otuloge Festus

Abstract

The cost overrun phenomenon on projects worldwide creates a major source of risk that warrants investigation. The prevailing factor school of thought provides strong empirical evidence that critical factors contributing to cost overruns are both context-specific and project-specific. Although many studies have been conducted identifying factors and causes of cost overruns, very few studies have investigated root causes. Additionally, a limited body of knowledge is available within the context of Small Island Development States (SIDS). To fill this gap, the objectives of this study were to identify and determine the main critical factors contributing to the cost overrun phenomenon in public sector social housing programmes (PSSHPs). These selected factors were thereafter categorized under leading root causes, and their severity was determined based on primary stakeholders’ perspectives. One hundred and twenty-three factors were identified from the literature, of which forty-one critical factors were extracted and grouped under four root causes based on a pilot survey of relevant public sector housing experts in the Trinidadian and Jamaican construction sectors. These refined factors and root causes were formulated into a questionnaire survey. One hundred and five responses were obtained from professionals who had a minimum of five years’ experience in various phases of public housing delivery. The severity of these critical factors was evaluated, ranked, and categorized using the relative importance index (RII) approach. The findings uncovered the leading root cause, which is political in nature. The top five critical factors are the selection of politically aligned contractors, the intentional design of inadequate contracts, the project actors' deliberately underestimating costs, the partisan project management team, and strategic misrepresentation. These findings are unique to SIDS and contribute to knowledge to reframe contemporary project management practices, which focus mainly on technical causes. Finally, as existing technical solutions are ineffective in curbing cost overruns in PSSHPs, these findings also inform public sector policymakers to focus on prioritization, control, and mitigation of political risks in formulating effective governance mechanisms. Doi: 10.28991/ESJ-2022-06-03-016 Full Text: PDF

Publisher

Ital Publication

Subject

Multidisciplinary

Cited by 10 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3