Author:
Muhammuddin Nur Nadhirah,Mohd-Danuri Mohd Suhaimi,Hanid Mahanim,Ismail Fadzida,Mohd Nawi Mohd Nasrun
Abstract
The upward trend of dispute claims and occurrences throughout different stages has detrimentally affected the outcomes of construction projects. Building upon two major themes from a systematic literature review (SLR) study, Principal Component Analysis (PCA) was performed to further group the extensive causes and strategies into several meaningful groups using the Statistical Social Package Science (SPSS) software. Questionnaires were used and issued to three main stakeholders (clients, consultants, and contractors) in the Klang Valley area. This paper presents the PCA findings, which have led to the development of a framework to prevent disputes in different stages of building construction projects. The PCA findings have narrowed down the major contributors of disputes to “Contract-related causes” and “Time-related causes”. PCA analysis has also shown that the three key themes of “Quality-related strategies,” “Business relationship-related strategies,” and “Productivity-related strategies” were the most effective ways to reduce disagreements. It is important to highlight that the findings related to the causes of disputes during the planning stage consistently align with those of a prior study. This underscores the importance of ethical conduct, particularly during the planning phase and, more specifically, within the tendering process.
Publisher
Malaysian Institute of Planners
Subject
Urban Studies,Geography, Planning and Development
Reference24 articles.
1. Adegbembo, T. F., Awodele, O., & Oke, A. (2020). A principal component analysis of knowledge management success factors in construction firms in Nigeria. Journal of Construction Project Management and Innovation, 10(1), 42-54.
2. Assaf, S., Hassanain, M.A., Abdallah, A., Sayed, A. M. Z., & Alsharani, A. (2019). Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), 597-615.
3. Ayudhya, B. I. N. (2011). Common dispute related to public work projects in Thailand. Songklanakarin Journal of Science and Technology, 33(5), 565-573.
4. Cakmak, E., & Cakmak, P. I. (2014). An analysis of causes of disputes in the construction industry using analytical network process. Procedia-Social and Behavorial Sciences, 109, 183-187.
5. Cohen, L., Manion, L., & Morrison, K. (2007). Research Methods in Education (6th ed.). Routledge Publishers, New York.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献