Determination of Ungated Ogee Spillway Length so as to Pass Design Flood Safely

Author:

Haktanır Tefaruk1ORCID

Affiliation:

1. ERCİYES ÜNİVERSİTESİ

Abstract

Because the flowrate over an ungated ogee spillway depends on the net head of the water conveyed in the approach channel and because the energy losses depend on the flowrate, computation of the spillway discharge for a given gross head of water in the reservoir entering the approach channel necessitates a trial-and-error scheme. For given information of (a) the elevations of the lake water surface and of the spillway apex, (b) the energy loss coefficient at the entrance, the side wall inclination, the length, and the roughness coefficient of the trapezoidal approach channel, an iterative method for computing the discharge over an ungated ogee spillway is presented. Next, for given information of (a) the (volume) ↔ (water surface elevation) relationship of the reservoir, (b) the spillway apex elevation, (c) the maximum allowed lake water surface elevation, and (d) the design flood hydrograph, an iterative method for computing both the length of the ungated ogee spillway and the outflow hydrograph simultaneously such that the maximum water surface elevation reached during routing of the design flood hydrograph becomes equal to the maximum allowed elevation is presented. Matching of the maximum water surface elevation reached in the reservoir while routing of the design flood hydrograph to the pre-specified maximum lake elevation requires a trial-and-error scheme of reservoir routing computations over many different-length spillways. The iterative method presented in this study which is executed in a single run of the coded computer program is a short-cut alternative to the long approach. The developed method is applied to Catalan Dam, which is one of the large dams in Türkiye from reservoir capacity, flood attenuation, and hydroelectricity production aspects, as a case study. The length of an ungated spillway is computed by the method presented here as an alternative to the existing radial-gated spillway, and the reservoir routing computations are done with the design flood hydrograph given in its final project by both the ungated and the gated spillways, and the maximum lake water surface elevations and the outflow hydrographs are found to be fairly close to each other.

Publisher

Teknik Dergi

Reference17 articles.

1. USBR (1987) Design of Small Dams, Chapter 9 Spillways, C. Hydraulics of Control Structures, 3rdedition, U.S. Department of the Interior, Bureau of Reclamation, U.S. Government Printing Office, Washington DC.

2. Sanko (2007) Final Feasibility Report of Yedigöze Dam ve Hydro-Power Plant (in Turkish), Appendix-4: Hydraulic Design of the Flood Spillway. Sanko Engineering and Consulting Company, Çetin Emeç Boulevard, 6th Street, No: 61/7, 06520 Balgat, Ankara, Turkey.

3. Temelsu (2007) Final Design Project of the Bayramhacılı Dam (Civil Engineering Works), Chapter 3.1 Hydraulic Computations, 4. Flood Spillway (in Turkish). Temelsu International Engineering Services Company, Çankaya, Ankara, Turkey.

4. DSİ (2006) Circular 2006/1 Criteria for Determining Design Flood for Spillways of Dams (In Turkish). General Directorate of State Water Works, Department of Dams and Hydropower Plants, Ankara, Türkiye.

5. Savage B M and Johnson M C (2001) Flow over Ogee Spillway: Physical and Numerical Model Case Study. Journal of Hydraulic Engineering - ASCE, 127(8), 640–649. https://doi.org/10.1061/(ASCE)0733-9429(2001)127:8(640)

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3