Lean IHOP Transformation of Shipyard Erection Block Construction

Author:

Kolich Damir1,Sladic Sasa1,Storch Richard L.2

Affiliation:

1. University of Rijeka

2. University of Washington

Abstract

The modern system of shipbuilding includes applying integrated hull construction, outfitting, and painting (IHOP) of ship interim products, as opposed to the traditional manner of first constructing the hull blocks, then performing basic outfitting and finally painting, all separate of each other. Even though most shipyards apply some degree of integration of all trades during vessel construction, much work could still be better integrated. This article analyzes and maps the present IHOP construction of a typical shipbuilding erection block in a real shipyard. Through the application of a product work breakdown structure and group technology, the degree of IHOP integration could be increased. This is demonstrated to be in compliance with the lean principles of improving flow and kaizen. The article will suggest how the vessel construction could be become leaner through a value stream map, thereby decreasing both duration time and man-hours, thus securing significant savings for the shipyard. 1. Introduction The concept of integrated hull construction, outfitting, and painting (IHOP) of ship blocks has existed for the past 40 years. However, the level of IHOP application differs among shipyards. There is still much rework and outfitting that is performed on the slipway or in the dry-dock as opposed to during the assembly or preerection construction phase. The main aim of IHOP is to construct and outfit and paint ship blocks to a high degree while minimizing the outfitting tasks for later construction stages. This method greatly reduces shipbuilding production man-hours which yields major savings for shipyards. The idea of IHOP derives from group technology. In the distant past, ships were built in the classic method with keel laying on the slipway followed by piecemeal steel construction with outfitting of ship equipment afterward. Outfitting includes all equipment that is not an integral part of the hull structure such as equipment foundations, pipes, cables, hangars, ladders, pumps, valves, boilers, purifiers, evaporators, bus and switchboards, diesel generator sets, the main engine, and all of the ship systems including the wheelhouse electronics and navigation equipment.

Publisher

The Society of Naval Architects and Marine Engineers

Subject

Mechanical Engineering,Ocean Engineering

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Advanced Outfitting Techniques for Shipyard Development: A 2000 GT Shipbuilding Case Study;Kapal: Jurnal Ilmu Pengetahuan dan Teknologi Kelautan;2023-10-11

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3