Abstract
Tugboat shipbuilding design drawings are currently prepared with insufficient and untimely information of material/equipment availability, resulting in drawing changes and errors, increased labor and material costs, and lengthening of ship completion time. It is proposed that the design drawings are only prepared after confirmation of material/equipment availability from vendors to deal with the problem. The concept of concurrent engineering is introduced by integrating design and vendor activities through adequate and timely vendor-furnished information (VFI) to deal with the problem. The PERT (program evaluation and review technique) computer simulation models were employed through the use of a simulation package AweSim to analyze the work activity networks of piping drawings. A cost savings of about $1,389,700 would be possible through a 10% reduction in total design and including piping drawings and development labor costs and construction labor and material costs. The completion time for preparing design drawings and ship construction can be reduced by about 186 days or 19.5% of the total throughput time for a tugboat shipbuilding process.
Publisher
The Society of Naval Architects and Marine Engineers
Subject
Mechanical Engineering,Ocean Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Application of fuzzy VIKOR method for the evaluation and selection of a suitable tugboat;Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment;2019-09-24