Abstract
The paper describes installation of pipe, electrical work, machinery, and ventilation systems in structural assemblies of AE Class ships prior to ways erection at Ingalls Shipbuilding Division. The prerequisites of planning, material, required facilities, and working drawings are examined. Organizations and implementation problems are also discussed together with that work which is most appropriate to preoutfit.
Publisher
The Society of Naval Architects and Marine Engineers
Subject
Mechanical Engineering,Ocean Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献