Affiliation:
1. Banco Nacional de Desenvolvimento Econômico e Social, Brazil
2. Fundação Getulio Vargas, Brazil
Abstract
Abstract This paper assesses the city of Belo Horizonte’s experience building school infrastructure through public-private partnerships (PPPs). Between 2009 and 2015, Belo Horizonte built very similar schools using both PPPs and traditional public contracting (TPC). As the choice of mode of contracting was unrelated to our outcomes of interest, the experience constitutes a quasi-experiment that allows for a simple and direct comparison of PPPs to TPC. We examine construction- and operation-phase outcomes measured using administrative data and a survey of school administrators. We find that schools constructed under the PPP contracting model outperformed those built using TPCs in most outcomes.
Reference59 articles.
1. Private Finance Initiative in the healthcare sector: trends and risk assessment;AKINTOYE Akintola;Engineering, Construction and Architectural Management,2005
2. Provision of public service infrastructure - the use of PPPs in the UK and Australia;BALL Robert;International Journal of Public Sector Management,2011
3. BH metas e resultados: expansão da educação infantil,2015
4. Edital e Contrato da Parceria Público-Privada das Umeis,2015
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献