Affiliation:
1. Universidade de Brasília, Brasil
Abstract
Abstract: In this research article, we present a methodological proposal for improving the process of monitoring public works using quality management. To do this, we have reviewed the monitoring process carried out by the National Education Development Fund (FNDE) during the Proinfância program. We adopted a case study based ondesign science researchas a methodology. This article presents the phases of the literature review, a map of the current work monitoring process, a survey and analysis of the data collected with the current process and a methodological proposal for the construction monitoring process. As a result of the work, a new flow for the work monitoring process is proposed, consisting of internal procedures, work routines and collection tools. The proposed methodology was applied to 15 works, and the results were analyzed.
Subject
Industrial and Manufacturing Engineering,Business and International Management
Reference28 articles.
1. Contratação e elaboração de projetos BIM na arquitetura e engenharia,2017
2. Project Cell: Cellular organization of the building design process;Aquere A. L.;Journal of Construction Engineering and Management,2013
3. NBR ISO 9.000: Sistemas de gestão da qualidade: fundamentos e vocabulário,2015
4. Bizagi Modeler,2019
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献