Affiliation:
1. Universidade de São Paulo, Brasil
Abstract
This paper focuses on the sequencing and scheduling problem of open pit mining, with the allocation of loading equipment considering a medium-term horizon. This study considers the existence of a heterogeneous loading equipment fleet and two types of mineable material, namely ore or waste rock. For the mining of ore, the following requirements are taken under consideration: the mixture quality, a crusher, the processing plant capacity and a stockpile, called ROM stockpile. In this context, we present a mathematical model in mixed integer linear programming, supported by an algorithm that is responsible for moving the time horizon at each model run, aiming to generate mining orders resolved with optimality. Together, these orders describe the loading equipment mining plan.
Subject
Economic Geology,Geochemistry and Petrology,Geology,Waste Management and Disposal,General Materials Science
Reference7 articles.
1. A review of operations research in mine planning;NEWMAN A;Interfaces,2010
2. Planejamento de operações de lavra em minas a céu aberto com alocação de equipamentos de carga e transporte;AMARAL M,2009
3. A new algoritm for the open pit mine production scheduling problem;CHICOISNE R;Operations Research,2012
4. An application of branch and cut to open pit mine scheduling;CACCETA L;Journal of Global Optimization,2003
5. Modelos matemáticos e heurísticas para auxílio ao planejamento de operações de lavra em minas a céu aberto;AMARAL M,2008
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献