1. Geodezija 3 (Geodesy 3);ALEKSIC I.,1990
2. Tensor structure applied to the least -squares method, revisited;BLAHA G.;Journal of Geodesy,1984
3. Mine Surveying;BORSHCH-KOMPONIETS V.,1989
4. Nonlinear time series: nonparametric and parametric methods;FAN J.,2005
5. Izravnanje prikljucnih trouglova izduzenog oblika (Adjustment of Connected Triangles Elongated in Shape);GANIC A.;Underground Mining Engineering,1999