The Captain Field, Block 13/22a, UK North Sea

Author:

Pinnock S. J.1,Clitheroe A. R. J.23,Rose P. T. S.24

Affiliation:

1. Texaco Ltd.Westferry Circus, Canary Wharf, London E14 4HA, UK EDCO Oil & Gas Ltd39 Portman Square, London, W1H 6LS, UK

2. Texaco Ltd.Langlands House, Huntly St., Aberdeen, AB10 1SH, UK rosept@texaco.com ChevronTexaco Upstream EuropePresent address: Seafield House, Hill of Rubislaw, Aberdeen AB15 6XL, UK

3. Present address: ChevronTexaco Upstream EuropeSeafield House, Hill of Rubislaw, Aberdeen AB15 6XL, UK

4. Landmark EAME Ltd.Wellheads Crescent, Dyce, Aberdeen AB21 7GA, UK

Abstract

AbstractThe Captain Field is located in Block 13/22a in the Western Moray Firth Basin of the UK North Sea, 80 miles NE of Aberdeen in a water depth of 340 ft. Hydrocarbons are trapped in two geographical regions, the Main and Eastern closures, both with a significant stratigraphic pinchout component. The principal reservoirs consist of turbidite sandstones of Lower Cretaceous age which have been informally subdivided into two stratigraphic units comprising the Upper and Lower Captain Sandstones. At the base of the preserved Jurassic section the Heather Sandstone, Oxfordian in age, provides a secondary reservoir. Reservoir quality is uniformly excellent in the Lower Cretaceous with in situ, Klinkenberg corrected permeability averaging 7 Darcies and porosity in the range 28-34%. The reservoir is generally poorly consolidated sandstone with the depth to the crest of the field at -2700 ft TVDss. The reservoirs contain a total oil-in-place of 1000 MMBO. The Upper Captain Sandstone has a small associated gas cap containing 16 BCF gas-in-place. The oil is heavy, by North Sea standards, with oil gravity ranging from 19° to 21° API and has high in situ viscosity, 150 to 47 cP, at the mean reservoir temperature of 87°F. The fluid properties and offshore location necessitate the employment of innovative horizontal drilling methods, completion design and artificial lift technology in order to achieve an economically viable field development. Extended reach horizontal wells, with reservoir completion lengths of up to 8000 ft, are drilled for all oil producers and water injectors. Development risks were significantly reduced following two appraisal drilling campaigns in 1990 and 1993 culminating with the successful drilling and extended testing of a prototype horizontal field development well (13/22a-10). The field is being developed in two phases, Area A and Area B. First oil production commenced from the Captain platform in March 1997 from Area A and the field now produces at between 50000 and 70000 BOPD. Area B development is now underway with first oil planned for December 2000. Completion of this phase of the development will increase the plateau production rate to 85000 BOPD.

Publisher

Geological Society of London

Subject

Geology

Reference15 articles.

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3