Scientific Support of Occupational Risk Management Decisions in Industrial Sectors in Case of Uncertainty

Author:

Kruzhilko OlegORCID,Mahmoud Alaa El DinORCID,Maystrenko VolodymyrORCID,Volodchenkova NataliaORCID,Polukarov OleksiyORCID,Sydorenko VolodymyrORCID,Pruskyi AndriiORCID,Arlamov OleksandrORCID

Abstract

Introduction: One of the most important steps in risk assessment is the selection of assessment methods. Traditionally, when developing measures to reduce the level of occupational morbidity and industrial injuries, the results of an analysis of the causes, types of events and other factors that led to accidents are used. But such an approach does not meet modern requirements. For an adequate assessment of occupational risks, it is necessary to have objective data from different time periods: the onset of traumatic events in the past, the current state of threats to life and health of people, and the future state of threats in industrial sectors. Methods: Mathematical modeling remains the main means of scientific support for occupational risk management. The Elmeri system was chosen for occupational risk assessment in this study, which can be easily and quickly used in any industry and in enterprises of all sizes. A critical analysis of various approaches to managing occupational risks in enterprises was applied to identify the strengths and weaknesses of these approaches. The method of generalizing the most effective approaches to occupational risk management was applied to develop the algorithm of occupational risk management decisions in industrial sectors in case of uncertainty. Results: An occupational risk management algorithm has been developed to substantiate management decisions on planning measures to reduce risk, the implementation of which ensures the effectiveness of measures aimed at reducing risk. Research has shown that if the decision-making situation is characterized by conditions of uncertainty (it is impossible to obtain mathematical models of acceptable accuracy), the assessment of the predictive values of occupational risk is carried out exclusively by an expert. Thus, the occupational risk indicator used at the final stage of planning activities determines the degree of achievement of the result of solving the task. Conclusion: It has been established that in conditions of uncertainty (lack of necessary data or available data are incomplete or unreliable), experts involved in solving the problem of risk management use their own knowledge and experience in solving similar problems. As a promising direction for further research, it should be noted the development of a methodology for a comprehensive assessment of the effectiveness of operational management decisions for planning and implementing measures to reduce risks

Publisher

Nepal Journals Online (JOL)

Subject

Public Health, Environmental and Occupational Health,Safety Research

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3