Construction and application of workover priority evaluation model for surface coalbed methane low production wells based on Entropy-TOPSIS

Author:

Li Yanhe,Zhu Lin,Lv Runsheng,Ni Xiaoming

Abstract

Affected by geology and mining, a certain number of low-yield wells will appear after a period of production in coalbed methane wells, and technical repairs are urgently needed to restore their production capacity to the maximum. Therefore, it is of great significance to establish a reasonable and feasible theoretical standard to evaluate the workover priority of CBM wells for the efficient utilization of CBM resources. From the perspectives of technical feasibility and economic rationality, eight key indicators that affect the cost performance of CBM well workover are screened. Combining the entropy value method and the TOPSIS comprehensive ranking method, the surface coalbed methane well repair priority entropy value-TOPSIS comprehensive evaluation model was constructed, and the surface coalbed methane well repair priority evaluation was carried out by taking 9 surface coalbed methane wells that urgently needed to be repaired in a mine as the evaluation objects. The evaluation results show that among the economic indicators, the average gas production per meter in the 30 days before the coal bed methane well was stopped and the cumulative gas production per meter before the stop had a relatively high weight, which were 29.68% and 13.83% respectively, This shows that in coalbed methane well workover operations, the long-term gas production potential of the coalbed methane well and the gas production capacity when disturbed by harmful factors are the decisive factors affecting the priority of coalbed methane well workover; Among the technical indicators, the degree of casing deformation and the depth of the coalbed methane well have a relatively high weight, accounting for 11.34% and 9.90% respectively, This shows that the smaller the deformation of the wellbore casing and the shallower the depth of the coalbed methane well, the higher the priority of the workover of the coalbed methane well; The ranking of the production recovery rates of the three coalbed methane wells in the Pingdingshan mining area after workover operations is consistent with the results output by the evaluation model, which proves that the evaluation model is reasonable for determining the priority of workovers for damaged wellbores; This evaluation model can provide a theoretical reference for small and medium-sized coalbed methane development companies to determine the priority of workovers.

Funder

National Natural Science Foundation of China

Publisher

Frontiers Media SA

Subject

Economics and Econometrics,Energy Engineering and Power Technology,Fuel Technology,Renewable Energy, Sustainability and the Environment

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3