Author:
Tang Shouquan,Li Minhong,Xie Hong,Wang Zhenzi,Yu Peng,Li Zhonghang,Wang Zhe,Chen Tengbiao,Wang Bangzhu
Abstract
High-temperature superconducting (HTS) cable can transmit massive power with little dissipation in a limited corridor, which is an attractive solution for future power transmission. Shenzhen Power Supply energized a 400 m/10 kV/2.5 kA concentric HTS cable system on 28 September 2021 to power Ping’an Financial Centre, a Shenzhen’s landmark building, which was the debut of concentric HTS cable made of YBCO in the urban area of a megacity. For more than 1 year, the HTS cable system has been operating well and will continue to operate for a long time. This paper systematically reviews the system specification, cable and its accessories design, cryogenic cooling system design, type and exploratory test, project construction, pre-commissioning test, and operation of the demonstration cable system. Based on our R&D practice, we identify that cost, long-term reliability, and operational simplicity are the main hinders factors that need to be addressed to advance the large-scale application and we propose a set of solution ideas meanwhile.
Funder
China Southern Power Grid
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献