Assessing the existing guidelines of environmental impact assessment and mitigation measures for future hydropower projects in Pakistan

Author:

Butt Asim Qayyum,Shangguan Donghui,Ding Yongjian,Banerjee Abhishek,Sajjad Wasim,Mukhtar Muhammad Ahsan

Abstract

Introduction: More than 16% of the total electricity used worldwide is met by hydropower, having local to regional environmental consequences. With positive indicators that energy is becoming more broadly available and sustainable, the world is moving closer to achieving Sustainable Development Goal 7 (SDG 7). Pakistan became the first nation to include the Sustainable Development Goals (SDGs) in its national development strategy.Methodology: The current study sought to investigate the structural limits of Environmental Impact Assessment (EIA) guidelines for hydropower development in Pakistan. The study included the document review of the EIA reports about hydropower projects in Pakistan, scientific questionnaires from decision-makers, and public consultation.Results and Discussion: The document evaluates that an adequate mechanism is available, and donors like the Asian Development Bank and World Bank observe the implementation process of EIA in Pakistan. However, a comprehensive analysis of the EIA system found several things that could be improved, not only in the institutional framework but also in actual implementation and practices. More than 20% of respondent decision-makers disagreed with the compliance of the current Institutional Framework with EIA guidelines, and 25% think that the existing guidelines followed in Pakistan are not aligned with international standards and practices for Hydropower in actual practice. EIA has a limited impact on decision-making due to insufficient technical and financial resources.Recommendations: There should be a think tank with experts who can meet the needs of present and future epochs. The public should be communicated with and educated about EIA. For better efficiency, the officers and decision-makers should be trained internationally, i.e., the Water and Power Development Authority (WAPDA).

Publisher

Frontiers Media SA

Reference63 articles.

1. Geospatial assessment of managed aquifer recharge potential sites in Punjab, Pakistan;Afzal;Remote Sens.,2023

2. Environmental impact assessment of hydropower projects in Turkey: applications and problems;Alaeddin;Fresenius Environ. Bull.,2017

3. Hydro power vs. Solar energy: the ultimate showdown Allen 2023

4. Projections of precipitation and temperature over the south asian countries in CMIP6;Almazroui;Earth Syst. Environ.,2020

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3