1. Cousland No.4 Well – Report on Formation Tests Carried Out Whilst This Well Was Drilling. Released BP Internal Report, August 1947
AdcockC. M.
1947
2. Cousland Area – Correlation Report in BP Cousland 5/W48 Petroleum Engineering Completion Report. Released BP Internal Report, July 1954
AdcockC. M.
3. Cousland Gas Reserves. Released BP Internal Report, 8 October 1954
AdcockC. M.
4. Underground Storage of Gas at Cousland. Released BP Internal Report, 20 December 1954
AdcockC. M.
5. Production Scheme for Cousland No.1 Well. Released BP Memorandum, January 1957
AdcockC. M.