Optimisation of the Construction Plan of Assembled Concrete Structures in Other Courtyard Buildings Based on Grey Clustering
-
Published:2022-10-28
Issue:3
Volume:22
Page:38-46
-
ISSN:1443-9255
-
Container-title:Electronic Journal of Structural Engineering
-
language:
-
Short-container-title:EJSE
Author:
Chen MoORCID, Feng YulongORCID, Kong Weilun
Abstract
The assembled concrete structure is a common construction solution in the current building industry, and it is debatable how to further improve the construction efficiency of the pointed claw assembled concrete structure. The study proposes a grey clustering method based on the improved OWA operator as a means to obtain more effective construction evaluation indicators. In performance tests, it was shown that the grey clustering method under the OWA operator optimisation is more capable of computing features for large amounts of data than traditional grey clustering, with an execution time of less than 200s. In the application tests of the construction scheme, the study showed that the proposed optimisation scheme has a more effective safety evaluation, shorter construction period and lower resource consumption. These results show that the use of grey clustering is effective in optimising the construction of assembled concrete structures, and that the optimised solutions show better reduction in construction time and resource utilisation than traditional construction solutions, so that the rational use of grey clustering in assembled buildings will help the construction industry to achieve greater efficiency in construction.
Publisher
EJSE International
Subject
Civil and Structural Engineering
Reference20 articles.
1. Barman, B., and Patra, S., "An Empirical Study of Neighborhood Rough Sets based Band Selection Techniques for Classification of Hyperspectral Images", IET Image Processing, Vol. 13, No. 8, June 2019, pp 1266-1279. 2. Bataglin, F. S., Viana, D. D., Formoso, C. T., and Bulhões, I. R., "Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM 1", Canadian Journal of Civil Engineering, Vol. 47, No. 2, March 2020, pp 165-177. 3. Bortolini, R., Formoso, C. T., and Viana, D. D., "Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling", Automation in Construction, Vol. 98, No. FEB., February 2019, pp 248-264. 4. Flores-Sosa, M., Avilés-Ochoa, E., Merigo, J. M., and Yager, R. R., "Volatility GARCH models with the ordered weighted average (OWA) operators", Information Sciences, Vol. 565, March 2021, pp 46-61. 5. Guan, F., Cui, W. W., Li, L. F., and Wu, J., "A Comprehensive Evaluation Method of Sensor Selection for PHM Based on Grey Clustering", Sensors (Basel, Switzerland), Vol. 20, No. 6, March 2020, pp 1710-1723.
|
|