Affiliation:
1. Delta State University
Abstract
The purpose of this paper is to apply R-squared in the analysis of estimated water encroachment into the reservoir. The data used for this work were gotten from records and these data were used to estimate water encroachment using Van Everdingen-Hurst (VEH) and Carter-Tracy models. The R-squared was obtained by plotting the value of estimated water encroachment against time. The results show that all the R-squared gotten in this work are more than 90% as indicated in all the graphs plotted. These results indicated that the variables involved in the computation of water encroachment are all considered, and the results also show that VEH is more reliable since it has higher R-squared. This method of analysis is faster and easy when compared with other methods like Durbin Watson and t-test.
Publisher
University of Benin - Faculty of Environmental Sciences
Subject
Management, Monitoring, Policy and Law,Geography, Planning and Development
Reference19 articles.
1. Abraham, B. and Ledolter J. (1983). Statistical methods for forecasting, John Wiley & Sons, New York.
2. Amer, B.B, Mazen A.M, Abbas M.A., Salim S.B.(2015). Prediction of Water Influx Effect on Oil Production in Biyad Oil Reservoir, Hadhramout University Journal of Natural & Applied Sciences; (12).
3. Anthony O.B., (2015) Detection of Water encroachment into a marginal field oil reservoir for ultimate recovery, SPE Nigeria International Conference and Exhibition,Nigeria:4-6.
4. Carter R.D.,Tracy, G.W., (1960) .An improved method for calculating water influx. Trans., AIME.
5. Daniel M Abrams, Richard J Wiener, (2010). A model of peak production in oil fields, American Journal of Physics;(78):24-27.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献