Simplified model for dam rockfill creep and influence of constructive delay of concrete face

Author:

Raposo RenatoORCID,Zamora Hernández YaslettyORCID,Assis AndréORCID

Abstract

Advances in equipment and tools implemented for geotechnics have been allowing design to be supported by numerical simulations. However, even with sophisticated resources, the dam geotechnical engineering industry still lacks few information on laboratory parameters as in the case of Concrete Face Rockfill Dams (CFRD). It is necessary to simplify the use of back-analysis that represent real CFRD, in search of tools that can be applied in the industry. The objectives include the simplification of the behavior of the linear modules associated with a linear coefficient representing the vertical creep and evaluation of the influence of the constructive delay of the concrete face in a specific case. The text goes through examples of real CFRD simulations, as a theoretical background. The CFRD calibration model includes an elegant representation of the vertical orthotropic rockfill creep with only two calibration parameters. The displacements obtained from a CFRD are represented with a linear elastic constitutive model with linear vertical deformation in time. The result is well adjusted both in the construction phase and during filling. Further on, six different slab constructive delay sequencing arrangements were simulated. The study uses a numerical device that makes it possible to drive the concrete slab in its correct design thickness. Among the stress results, the step-by-step sequencing of the slab following the rockfill reached the worst horizontal stresses, reaching almost 45 MPa, which exceeds the typical compressive strengths of conventional concretes that can affect the structural integrity of the slab. The results suggest that step-by-step sequencing should be avoided. In the case studied, the balanced behavior could be achieved in a concreting scenario maintaining the constructive delay of the slab with at least half the height of the dam. It is important to point out that all this work considerations serve for a specific example. Any generalization should be avoided or associated with broader complementary studies, as each dam is a unique work and must be studied individually, case by case.

Publisher

ABMS - Brazilian Association for Soil Mechanics and Geotechnical Engineering

Subject

Geotechnical Engineering and Engineering Geology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3