1. 1) Nuclear and Industrial Safety Agency (NISA), Report on the Facility Soundness Evaluation of Unit 7 of TEPCO’s Kashiwazaki-Kariwa Nuclear Power Station, NISA (2009), [in Japanese].
2. 2) Nuclear and Industrial Safety Agency (NISA), Report on the Aseismic Reliability Evaluation of Unit 5 of TEPCO’s Kashiwazaki-Kariwa Nuclear Power Station, NISA (2010), [in Japanese].
3. 3) S. Yoshimura, K. Kobayashi, H. Akiba, S. Suzuki, M. Ogino, “Seismic response analysis of full-scale boiling water reactor using three-dimensional finite element method,” Trans. At. Energy Soc. Jpn., 11[3], 203-221 (2012), [in Japanese].
4. 4) S. Yoshimura, K. Kobayashi, H. Akiba, S. Suzuki, M. Ogino, “Seismic response analysis of full scale boiling water reactor using three dimensional finite element method,” J. Nucl. Sci. Technol., 52[4], 546-567 (2015).
5. 5) Report of Investigation Committee of the Accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company, (Interim Report, 26 Dec., 2011) (Final Report, 23 Jul., 2012).