1. 1) T. Koike, “New regulatory requirements and the restart of nuclear power plants: Issues in the case of Sendai Nuclear Power Station[新規制基準と原子力発電所の再稼働:川内原発再稼働をめぐる論点を中心に],” Issue Brief, 840, National Diet Library Research and Legislative Reference Bureau (2015), [in Japanese].
2. 2) S. Sugawara, H. Kimura, H. Madarame, “How can the local governments engage in nuclear safety governance?: A case analysis of the safety agreement of Hamaoka,” J. JSCE Div. D, 66[3], 316–328 (2010), [in Japanese]. DOI:10.2208/jscejd.66.316.
3. 3) S. Sugawara, T. Inamura, H. Kimura, H. Madarame, “Analysis of relationship between the local governments and the power companies through the changes of safety agreements,” Trans. At. Energy Soc. Jpn., 8[2], 154–164 (2009), [in Japanese]. DOI:10.3327/taesj.J07.048.
4. 4) S. Sugawara, “Present situation and issues of nuclear safety agreement: Focusing on the role of the local governments[原子力安全協定の現状と課題:自治体の役割を中心に],” Jurist, 1399, 35–43 (2010), [in Japanese].
5. 5) Ministry of Economy, Trade and Industry, The Fifth Strategic Energy Plan, Ministry of Economy, Trade and Industry, [Internet] (2018), [in Japanese], https://www.enecho.meti.go.jp/category/others/basic_plan/pdf/180703.pdf (cited 2018 Dec. 20).