1. [1] Seki, H. et al.: Estimation of decommissioning quantity based on 3D intelligent model. WM2017 Conference, Phoenix, Arizona, USA, March 5-9, 17075 (2017).
2. [3] Schrijver, A.: Combinatorial Optimization, Vol. A, Springer, pp.38-47 (2003).
3. [5] Rashid, M. F. F., Hutabarat, W., Tiwari, A.: A review on assembly sequence planning and assembly line balancing optimization using soft computing approaches. International Journal of Advanced Manufacturing Technology 59 (1-4), pp.335-349 (2011).
4. [6] Hongguang, Lv., Cong, Lu.: A discrete particle swarm optimization algorithm for assembly sequence planning. 2009 8th International Conference on Reliability, Maintainability and Safety, IEEE, Chengdu, China, July 20-24, 2009, pp.1119-1122 (2009).
5. [7] Sinanoglu, C.: Design of an artificial neural network for assembly sequence planning system. International Journal of Industrial Engineering 15 (1), pp.92-103 (2008).