Towards a Better Understanding of Concrete Arch Dam Behavior during the First Filling of the Reservoir

Author:

Leitão Noemi Schclar1ORCID,Castilho Eloísa2ORCID,Farinha M. Luísa Braga1ORCID

Affiliation:

1. Laboratório Nacional de Engenharia Civil (LNEC), Av. do Brasil, 101, 1700-066 Lisbon, Portugal

2. Instituto Superior Técnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisbon, Portugal

Abstract

During the first filling, the reservoir is gradually raised in multiple stages. At each stage, the filling is paused to allow adequate time for monitoring and evaluating the performance of the dam and its foundation. The analysis of the monitored behavior and assessment of security conditions is performed by comparing the values measured by the monitoring system installed in the dam with the values predicted by numerical models representing the structural behavior, the material properties, and the loads. This article addresses the main aspects related to the safety control of concrete arch dams during the first filling of the reservoir. Special attention is given to the nonlinear behavior induced by the opening/closing of the contraction joints. An example of numerical simulation of the behavior of an arch dam during the first filling of the reservoir is also presented. The validation of the computed temperatures, the induced displacements and the induced stresses was performed by comparison with the values measured with the monitoring system installed in the dam.

Publisher

MDPI AG

Subject

Safety, Risk, Reliability and Quality,Civil and Structural Engineering

Reference44 articles.

1. Association of State Dam Safety Officials (2022, November 23). Lessons Learned from Dam Incidents and Failures. Available online: https://damfailures.org/lessons-learned/the-first-filling-of-a-reservoir-should-be-planned-controlled-and-monitored/.

2. ICOLD (2018). Dam Surveillance Guide, CRC Press/Balkema. International Commission on Large Dams Bulletin 158.

3. Zacny, K., Malla, R.B., and Binienda, W. (2012). Earth and Space 2012: Engineering, Science, Construction, and Operations in Challenging Environments, ASCE.

4. Prediction of and Early Warning for Deformation and Stress in the Xiaowan Arch Dam during the First Impounding Stage;Zhou;Appl. Mech. Mater.,2013

5. Analysis of Working Behavior of Jinping-I Arch Dam during Initial Impoundment;Wu;Water Sci. Eng.,2016

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3