Development and Height Prediction of Fractured Water-Conducting Zone in Weakly Cemented Overburden: A Case Study of Tashidian Erjingtian Mine

Author:

Zhang Lifei12ORCID,Zhang Zizhao13,Wang Kaikai14ORCID,Tan Xiaodong15,Zhang Lei1,Zhang Tiandong1

Affiliation:

1. School of Geology and Mining Engineering, Xinjiang University, Urumqi 830046, China

2. The First Regional Geological Survey Brigade, Xinjiang Bureau of Geo-Exploration & Mineral Development, 466 North Tianjin Road, Urumqi 830011, China

3. State Key Laboratory for Geomechanics and Deep Underground Engineering, Xinjiang University, Urumqi 830046, China

4. State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China

5. Shenzhen Hongyeji Geotechnical Technology Co., Ltd., Shenzhen 518055, China

Abstract

To clarify the development and height of the fractured water-conducting zone of underground mines with weakly cemented overburden, the W8203 working face of the Tashidian Erjingtian Mine in Xinjiang, China, was selected to carry out a case study. Firstly, a physical analog model test was conducted to investigate the development law of the water-conducting fracture zone, followed by a numerical simulation via the PFC2D program. Afterward, a theoretical analysis based on the key stratum theory was carried out. The results demonstrated that there were one primary key stratum and three sub-key strata upon the W8203 working face. As verified by the physical analog tests, the water-conducting fracture developed to the bottom of the primary key stratum, and the height of the fractured water-conducting zone was 246.38 m. The numerical analysis suggests that the primary key stratum did not completely break and the fracture did not penetrate the stratum. Theoretical calculation indicated that the primary key stratum maintained stability in the structure without any breakage. The height of the fractured water-conducting zone is comprehensively determined to be 246.38 m, which is relatively close to the measured value (229.32 m). Based on the prediction method of key stratum position combined with the characteristics of weak cemented overburden, a method to predict the height of a water-conducting fracture zone suitable for weak cemented overburden was developed. The accuracy of this method was also verified through an in-depth comparison with field test results. Under the background of the “strategic westward shift” of coal resource exploration and development in China, the research results can provide theoretical and technical support for safe production in the Tashidian Mining Area and references for green and safe production in weakly cemented overburden mining areas in western China.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference61 articles.

1. Physical and mechanical characteristic of rocks with weakly cemented strata in Western representative mining area;Sun;J. China Coal Soc.,2019

2. Pore media characteristics of Jurassic weak cemented sandstone and its significance for water—preserved coal mining;Liu;J. China Coal Soc.,2019

3. Experimental Study on the Permeability of Weakly Cemented Rock under Different Stress States in Triaxial Compression Tests;Fan;Geofluids,2018

4. Physical simulation research on evolution laws of clay aquifuge stability during slice mining;Zhang;Environ. Earth Sci.,2018

5. Mechanisms of Aquifer Protection in Underground Coal Mining;Fan;Mine Water Environ.,2015

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3