Abstract
The introduction of a complex electrical vehicle charging (EVC) infrastructure consisting of an electrical vehicle (EV) charger and renewable energy source (RES) in the distribution system has been required as an important countermeasure for global environmental issues. However, the problems for hosting capacity and power stability of the distribution feeder can be caused by the penetration of lager scaled RES and EVC infrastructure. Further, it is required for the efficient operation method to prevent congestion and to ensure hosting capacity for the distribution feeder due to the increase of variable RES and EVC infrastructure in the distribution systems. In order to solve these problems, it is necessary to develop a technology which is capable of stably introducing an EVC infrastructure without reinforcing the existing distribution system. Therefore, to maintain the existing hosting capacity of distribution feeder and allowable limits, this paper presents a virtual power line (VPL) operation method using Energy Storage System (ESS) based on the power and voltage stabilization control to ensure hosting capacity of the EVS infrastructure. The proposed operation method is determined by optimal power compensation rate (PCR) and voltage compensation rate (VCR). Specifically, ESS for VPL is controlled according to the charging and discharging mode is operated according to the comparison value of the PCR and VCR. From the test results, it is verified that hosting capacity of the distribution system can be maintained using the proposed control method of ESS for VPL operation.
Funder
Korea Institute of Energy Technology Evaluation and Planning
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献