1. Black, A., and Judzis, A. (2004). Smaller Footprint Drilling System for Deep and Hard Rock Environments; Feasibility of Ultra-High Speed Diamond Drilling, Technical Progress Report.
2. Judzis, A., Black, A., and Robertson, H. (2006). Smaller Footprint Drilling System for Deep and Hard Rock Environments; Feasibility of Ultra-High-Speed Diamond Drilling, Technical Report: 2006.
3. Judzis, A., Boucher, M., McCammon, J., and Black, A.D. (2006, January 21–23). Investigation of Smaller-Footprint Drilling System; Ultrahigh-Rotary-Speed Diamond Drilling Has Potential for Reduced Energy Requirements. Proceedings of the IADC/SPE Drilling Conference, Miami, FL, USA.
4. Judzis, A., Black, A., and Robertson, H. (2007). Smaller Footprint Drilling System for Deep and Hard Rock Environments Feasibility of Ultra-High-Speed Diamond Drilling, TerraTek, Inc.. Phase 1 Final Report.
5. TerraTek (2024, April 10). Smaller Footprint Drilling System for Deep and Hard Rock Environments Feasibility of Ultra-High-Speed Diamond Drilling. Final Report, Available online: https://netl.doe.gov/files/oil-gas/NT15401_FinalReport.pdf.