Sizing a Renewable-Based Microgrid to Supply an Electric Vehicle Charging Station: A Design and Modelling Approach
-
Published:2024-08-12
Issue:8
Volume:15
Page:363
-
ISSN:2032-6653
-
Container-title:World Electric Vehicle Journal
-
language:en
-
Short-container-title:WEVJ
Author:
Khazali Amirhossein1ORCID, Al-Wreikat Yazan1, Fraser Ewan J.1ORCID, Naderi Mobin2ORCID, Smith Matthew J.2ORCID, Sharkh Suleiman M.1ORCID, Wills Richard G.1, Gladwin Daniel T.2ORCID, Stone David A.2, Cruden Andrew J.1ORCID
Affiliation:
1. School of Engineering, University of Southampton, Southampton SO17 1BJ, UK 2. Department of Electronic and Electrical Engineering, University of Sheffield, Sheffield S10 2TN, UK
Abstract
In this paper, an optimisation framework is presented for planning a stand-alone microgrid for supplying EV charging (EVC) stations as a design and modelling approach for the FEVER (future electric vehicle energy networks supporting renewables) project. The main problem of the microgrid capacity sizing is making a compromise between the planning cost and providing the EV charging load with a renewable generation-based system. Hence, obtaining the optimal capacity for the microgrid components in order to acquire the desired level of reliability at minimum cost can be challenging. The proposed planning scheme specifies the size of the renewable generation and battery energy storage systems not only to maintain the generation–load balance but also to minimise the capital cost (CAPEX) and operational expenditures (OPEX). To study the impact of renewable generation and EV charging uncertainties, the information gap decision theory (IGDT) is used to include risk-averse (RA) and opportunity-seeking (OS) strategies in the planning optimisation framework. The simulations indicate that the planning scheme can acquire the global optimal solution for the capacity of each element and for a certain level of reliability or obtain the global optimal level of reliability in addition to the capacities to maximise the net present value (NPV) of the system. The total planning cost changes in the range of GBP 79,773 to GBP 131,428 when the expected energy not supplied (EENS) changes in the interval of 10 to 1%. The optimiser plans PV generation systems in the interval of 50 to 63 kW and battery energy storage system in the interval of 130 to 280 kWh and with trivial capacities of wind turbine generation. The results also show that by increasing the total cost according to an uncertainty budget, the uncertainties caused by EV charging load and PV generation can be managed according to a robustness radius. Furthermore, by adopting an opportunity-seeking strategy, the total planning cost can be decreased proportional to the variations in these uncertain parameters within an opportuneness radius.
Funder
Engineering and Physical Sciences Research Council
Reference31 articles.
1. Digitalization to achieve sustainable development goals: Steps towards a smart green planet;Mondejar;Sci. Total Environ.,2021 2. Joint planning of smart EV charging stations and DG eco-friendly remote hybrid microgrids;Shabaan;IEEE Trans. Smart Grid,2019 3. AC versus DC microgrid planning;Lotfi;IEEE Trans. Smart Grid,2015 4. Khazali, A., Al-Wreikat, Y., Fraser, E., Naderi, M., Smith, M., Sharkh, S., Wills, R., Gladwin, D., Stone, D., and Cruden, A. (2024, January 23–26). Sizing a renewable-based microgrid to supply and electric vehicle charging station: A design and modelling approach. Proceedings of the 37th International Electric Vehicle Symposium & Exhibition, Seoul, Republic of Korea. 5. Techno-economical model-based optimal sizing of PV-Battery systems for microgrids;Bandyopadhyay;IEEE Trans. Sustain. Energy,2019
|
|