Author:
Costa Tatiane Silva,Villalva Marcelo Gradella
Abstract
In 2018 the number of people without access to electricity dropped to less than 1 billion. However, the difficulty of serving these people became higher, as the locations are in the most remote areas of the world. Brazil, for example, needs to bring electricity to around 1 million people who, in the vast majority, live within the Amazon region. In this way, hybrid energy systems (HESs) count as an attractive alternative for power generation, especially in remote areas. Therefore, this article analyzes a case study of a hybrid photovoltaic-diesel system installed in the Tapajós-Arapiuns Extractive Reserve in the Brazilian Amazon region. The studied plant is composed of a photovoltaic (PV) system, a lead-acid electrochemical battery bank, a diesel generator, and electro-electronic loads with highly variable demand throughout the year. The HOMER PRO software is used as the simulation tool. The results show that the load following dispatch strategy is the best option, with 85.6% of the load demand being supplied by PV energy and only 14.4% by the diesel generator set. As a result, the system is technically feasible to be replicated as a reliable energy source in other areas of the reserve to supply schools, public health places, and other community services.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Reference81 articles.
1. Access to Energy. In Our World in Data—University of Oxfordhttps://ourworldindata.org/energy-access
2. World Development Indicators Online Database. The World Bank Grouphttps://datacatalog.worldbank.org/dataset/world-development-indicators
3. SDG7: Data and Projections. International Energy Agencyhttps://www.iea.org/reports/sdg7-data-and-projections
4. Governo prevê prazo de 7 a 10 anos para que luz chegue a 72 mil famílias da Amazônia. Agência Câmara de Notíciashttps://www.camara.leg.br/noticias/617876-governo-preve-prazo-de-7-a-10-anos-para-que-luz-chegue-a-72-mil-familias-da-amazonia.
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献