Abstract
Dynamic safety factors during the construction of an overlapping tunnel-group metro station were studied in the framework of the strength-reduction finite element method. Based on the equivalent plastic strain and displacement of surrounding rock, its damage mode under typical excavation conditions was investigated. The aim of this investigation was to provide information for the design activities concerning the supporting system of the station and the pre-reinforcement of its surrounding ground. The accuracy of the model was assessed by comparing the ground settlements obtained from on-site monitoring with those from the numerical model. The analysis results show that the safety factor reaches the minimum when the No. 3 guide hole of the station hall is excavated. Thus, this is the most dangerous construction step. During this step, the plastic zone penetration phenomenon occurs in the surrounding rock, which is sandwiched between the hall and the platform of the station. In this case, both the deformation of the surrounding rock and the internal forces of the lining increase. The surrounding rock in the sidewall loses its stability. Thereafter, the primary support plays a role of stabilizing the guide hole.
Funder
Ministry of Science and Technology of the People's Republic of China
Federal Ministry of Education, Science and Research
National Natural Science Foundation of China
Tongji University
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献