Affiliation:
1. Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia
2. Faculty of Civil and Geodetic Engineering, University of Ljubljana, 1000 Ljubljana, Slovenia
Abstract
A methodology for determining overbreaks in hard rock tunnel construction using the drill-and-blast technique is presented in this paper. The methodology was developed for and applied to crystalline medium- to thick-bedded limestone, but it can be used in any jointed hard rock mass. Overbreaks are inevitable in hard rock tunnelling in a low-confinement environment (shallow tunnels up to several hundred meters deep) as a result of wedge failures along unfavourably oriented discontinuities caused by blasting. It is widely accepted in engineering practise that overbreaks will be inevitable even if smooth contour blasting is applied. If not controlled, overbreaks can result in extreme financial and time costs; and determining, predicting, and mitigating them is the key to successful tunnel construction in hard rock. Technological overbreaks, which are caused by the inappropriate use of drill-and-blast excavation, are not easily distinguished from the inevitable overbreaks dictated by the geological conditions with which they interfere and overlap. A methodology was developed with the aim of distinguishing the two causes of overbreaks, which can be applied in any phase of tunnel construction for evaluation or mitigation. The analysis of key inputs, including geological face mapping, shear strength tests along discontinuities of the rock mass, and their spatial orientation relative to tunnel advancement and survey overbreak measurements, is presented in this paper. Due to the stochastic and statistical nature of the problem, a probabilistic concept was also applied as part of the method so that the probability of failure around unprotected tunnel sections could be determined. The so-called stability criterion is introduced to distinguish between stable and unstable sections in terms of the probabilistic safety factor. The quantification of overbreaks, including the threshold value distinguishing technological from geological overbreaks, is proposed. The application of the methodology, demonstrated on an 8.1 km long section of a 12 km long pressure tunnel in hard rock, is presented in the paper.
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference33 articles.
1. The new Austrian Tunelling Method (Part 1 and Part 2);Rabcevicz;Water Power,1964
2. Zou, D. (2017). Theory and Technology of Rock Excavation for Civil Engineering, Springer.
3. Zhou, Z., Cheng, R., Cai, X., Jia, J., and Wang, W. (2019). Comparison of Presplit and Smooth Blasting Methods for Excavation of Rock Wells. Shock Vib., 3743028.
4. Pre-split blasting design to reduce costs and improve safety in underground mining;Raymundo;Energy Rep.,2022
5. Causes, impact and control of overbreak in underground excavations;Singh;Tunn. Undergr. Space Technol.,2005
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献