1. Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes;Cho;J. Manag. Eng.,2020
2. Optimized scheduling method for office building renovation projects;Cho;Expert. Syst. Appl.,2021
3. Building Information Modeling (BIM) for existing buildings—Literature review and future needs;Volk;Autom. Constr.,2014
4. Karl Becker, N., Ireland, D., Kennedy, N., Nathwani, R., Ross, B., and Teron, W. (2016). Structural Condition Assessments of Existing Buildings and Designated Structures Guideline, Professional Engineers.
5. Holický, M., Návarová, V., Gottfried, R., Kronika, M., Marková, J., Sýkora, M., and Jung, K. (2013). Basics for Assessment of Existing Structures, Kolkner Institute, Czech Technical University in Prague.