Abstract
In this paper, a comprehensive evaluation factor model of a truck dispatching system in open-pit mines is constructed from the three dimensions of optimal route, traffic flow planning, and real-time dispatching, and the final combined weight of the factor is determined according to game theory. On this basis, a comprehensive evaluation model of a truck dispatching system in open-pit mines based on gray relational analysis—technology for order preference by similarity to an ideal solution (GRA-TOPSIS) is established. Taking the truck dispatching system in five open-pit mines as the research background, the advantages and disadvantages of the dispatching system were comprehensively evaluated, and the differences between the dispatching systems were analyzed using the radar chart method. The research shows that the evaluation results of the comprehensive evaluation model of the truck dispatching system in open-pit mines based on GRA-TOPSIS are in line with the reality, which is more conducive to analyzing and comparing the advantages and disadvantages of the systems, effectively identifying the differences of various systems, and making the evaluation of truck dispatching systems more scientific. The research results of this paper broaden the evaluation of truck dispatching systems and provide a theoretical basis for the optimization of truck dispatching systems.
Funder
Ministry of Science and Technology of the People's Republic of China
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction
Reference20 articles.
1. Study on Optimization of Coal Truck Flow in Open-Pit Mine
2. A Multiagent System for Truck Dispatching in Open-pit Mines;Icarte;Proceedings of the International Conference on Dynamics in Logistics,2020
3. Research on truck optimal scheduling in open-pit mine based on artificial fish swarm neural net-work evolution;Ruan;Min. Res. Dev.,2021
4. Truck scheduling optimization in open pit mines based on improved DCW-QPSO algorithm;Wang;Metal Mine,2019
5. Study on Scheduling Method in Open Mine by Truck Based on SA-GA Algorithm;Guo;Master’s Thesis,2015
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献