1. Longwall recovery utilizing the open entry method and various cement-concrete supports;Bauer;Proceedings of the 7th International Conference on Ground in Mining,1988
2. Assessment of Experimental Longwall Recovery Rooms for Increasing Productivity and Expediting Equipment Removal Operations,1989
3. Productivity and equipment removal enhancement using pre-driven longwall recovery rooms;Bauer;Proceedings of the 1989 Multinational Conference on Mine Planning and Design,1989
4. Mining through in-panel entries and full-face recovery room without standing support at U.S. Steel Mine 50;Smyth;Proceedings of the 17th Conference on Ground Control in Mining,1998
5. The effect of standing support stiffness on primary and secondary bolting systems;Tadolini;Proceedings of the 22nd International Conference on Ground Control Mining,2003