Abstract
In order to study the impact of the blasting vibration of subway tunnels on adjacent buildings, taking the tunnel mining method construction of the section between Zhifang Street Station and Metro Town Station of Wuhan Metro Line 27 as the engineering background, the blasting scheme is optimized by reducing the maximum single section charge, multi-section and densifying the surrounding holes. The HHT method and wavelet analysis are used to evaluate the advantages and disadvantages of the optimization scheme from the perspective of energy. The results show that the peak velocity of the blasting vibration is significantly reduced and the frequency is significantly increased after the blasting scheme is optimized. After the blasting scheme is optimized, when the working face is directly below the external wall of the building, the peak vibration velocity is the largest; from the back of the working face to the front of the working face, the peak velocity of the surface particle vibration first increases and then decreases. The frequency band of the optimized blasting vibration signal energy distribution is wider and the energy is more dispersed. This study can provide some practical experience for the design and construction of similar projects.
Funder
National Natural Science Foundation of China
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献