Abstract
Regular transmission maintenance is important to keep the infrastructure resilient and reliable. Delays providing on-time maintenance increase the forced outage rate of those assets, causing unexpected changes in the operating conditions and even catastrophic consequences, such as local blackouts. The current process of maintenance schedule is based on the transmission owners’ choice, with the final decision of system operator about the reliability. The requests are examined on a first-come, first-served basis, which means a regular maintenance request may be rejected, delaying the tasks that should be performed. To incorporate optimization knowledge into the transmission maintenance schedule, this study focuses on the co-optimization of maintenance scheduling and the production cost minimization. The mathematical model co-optimizes generation unit commitment and line maintenance scheduling while maintaining N-1 reliability criterion. Three case studies focusing on reliability, renewable energy delivery, and service efficiency are conducted leading up to 4% production cost savings as compared to the business-as-usual approach.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献