Abstract
To ameliorate the inflow state of the joint hub of a pump station and sluice, a γ-shaped settlement training wall was designed with its state adjusted automatically in line with the actual working condition of the project. The central composite design (CCD) of the response surface method was adopted to optimize the geometrical size of the training wall in the operational states of pumping and free-draining separately. The results showed that the alteration of different size factors of the γ-shaped settlement training wall had different degrees of influence on its rectification effect; the intake flow state of the joint hub of the sluice and pumping station with the γ-shaped settlement training wall can be significantly improved with the flow velocity uniformity in the inlet channel next to the junction of the sluice chamber, reaching 80.42%, and the flow velocity uniformity ahead of the sluice, reaching 84.78%, in the operational state of free-draining. By combining the results of numerical simulation, the feasibility of the response surface method was further verified and the optimal combination of geometric parameters of the γ-shaped settlement training wall were also obtained, which can be adopted in the design of the actual joint hub of the pump station and sluice.
Funder
National Natural Science Foundation of China
Priority Academic Program Development of Jiangsu Higher Education Institutions
Subject
Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献