Abstract
Production of Portland clinker is inherently associated with CO2 emissions originating from limestone decomposition, the irreplaceable large-scale source of calcium oxide needed. Besides carbon capture and storage, CO2 mineralization is the only lever left to reduce these process emissions. CO2 mineralization is a reversal reaction to clinker production—CO2 is bound into stable carbonates in an exothermic process. It can be applied in several environmentally and economically favorable ways at different stages of clinker, cement and concrete life cycle. These possibilities are assessed and discussed in this contribution. The results demonstrate that when combined with concrete recycling, the complete circularity of all its constituents, including the process CO2 emissions from the clinker, can be achieved and the overall related CO2 intensity significantly reduced.
Funder
Ministry of Science and Higher Education
AGH University of Science and Technology
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
33 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献