INV-FLOW: New Possibilities to Evaluate the Technical Condition and Function of Extraction Wells

Author:

Kukačka JanORCID,Pech PavelORCID,Ficaj VáclavORCID,Kahuda DanielORCID

Abstract

The declining supply of available groundwater resources is increasing the importance of extraction wells. To maximize the yield of extraction wells, the operators do not always respect the sustainable use of groundwater resources. These efforts can affect water quality and impact the service life of an extraction well, mainly through the clogging process. As part of the INV-FLOW project, an apparatus for evaluating the functionality of an extraction well by measuring the vertical water flow through its screen and filter was designed and tested. The apparatus consists of two electromagnetic induction flowmeters, two pneumatic seals, and a pump with the possibility of regulation. After an initial laboratory verification of the fundamental concept, the apparatus was successfully tested in real conditions. Two extraction wells, HJ-3 and HJ-4, intended for water supply to an agricultural production plant, were measured at a pilot site in the Czech Republic using the INV-FLOW apparatus. Although the HJ-3 extraction well is at the end of its service life, the HJ-4 extraction well is a newly installed well. In the new extraction well, HJ-4, a high proportion of water flowing through the gravel pack relative to the total pumping flow (93–97%) was measured using the INV-FLOW apparatus at different pumping rates. In the case of the HJ-3 extraction well, screen and filter clogging contributed significantly to the limited water flow through the gravel pack. In the most affected parts of the extraction well (15–20 m b.g.l.), the proportion of water flowing through the gravel pack relative to the total pumping flow ranged from 10 to 20%. The pilot tests confirmed the functionality of the apparatus and the possibility of using it to evaluate the degree of clogging and incrustation of an extraction well. The pilot tests thus demonstrated the usability of the INV-FLOW apparatus. The extraction well operator can assess the level of clogging or incrustation of the extraction well and decide on the need for the rehabilitation of an extraction well, or the termination of its operation.

Publisher

MDPI AG

Subject

Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry

Reference48 articles.

1. Hydrogeologické Vrty;Betuš,1998

2. Ultrasonic Removal of Clogging and Evaluation of Flow Capacity of Geotextile Drain

3. Evaluation of substrate clogging in a full-scale horizontal subsurface flow treatment wetland using electrical resistivity tomography with an optimized electrode configuration

4. Groundwater and Wel;Sterrett,2007

5. Co můžeme najít v zapažených průzkumných vrtech? Sborník vědeckých prací Vysoké školy báňské-Technické univerzity Ostrava;Bláha;Řada Stavební,2005

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3