Study on the Influence of an Under-Crossing Parallel Double-Line Shield Tunnel on the Existing Tunnel Structure

Author:

Zeng Linhai12,Zhang Daobing1ORCID,Lian Changjiang2,Zhang Jiahua3,Yin Huadong1

Affiliation:

1. School of Resource Environment and Safety Engineering, Hunan University of Science and Technology, Xiangtan 411201, China

2. Guangdong Zhonggong Architectural Design Institute Co., Ltd., Guangzhou 510700, China

3. Work Safety Key Lab on Prevention and Control of Gas and Roof Disasters for Southern Coal Mines, Hunan Provincial Key Laboratory of Safe Mining Techniques of Coal Mines, Hunan University of Science and Technology, Xiangtan 411201, China

Abstract

Extra care should be taken when new tunnels pass through an existing tunnel. If it is not handled properly, this will affect the operation safety of the existing line, and bring security risks to the train’s operation. In order to study the impact of an under-crossing parallel double-line shield tunnel on the existing shield tunnel structure, the influence of tunnel construction on the deformation of overlying strata was analyzed, and the formula for estimating the formation settlement at depth Z below the surface, caused by the excavation of a double-tunnel parallel tunnel, was deduced. Then, a series of three-dimensional finite element numerical simulations were carried out. We analyzed and systematically studied the adverse effects of the tunnel structure of Guangzhou subway Line 5, caused by the tunneling of subway Line 18, evaluated its structure and operational safety, and provided suggestions for site construction. This research demonstrates the following conclusions. (1) The tunnel structures of subway Line 5 and Line 18 are mainly in the strongly weathered argillaceous siltstone stratum, and lightly weathered argillaceous siltstone stratum, respectively, and the stratum where the Line 18 tunnel is located is relatively safe. (2) According to three-dimensional finite element numerical simulation analysis, during the shield-tunneling process of subway Line 18, the maximum X horizontal displacement, the maximum Y horizontal displacement, and the maximum Z vertical displacement of the tunnel structure in subway Line 5 are 1.09, 3.50, and 4.55 mm, respectively. It is considered that the impact of the shield-tunnel penetration of subway Line 18 on the tunnel structure of subway Line 5 is relatively controllable, and does not affect the structure and operational safety. (3) It is suggested that settlement monitoring should be strengthened within the range of 12 m (about 1.5 tunnel diameter D). before and after the excavation axis of the underpass tunnel, and it is necessary to carry out local reinforcement treatment, to prevent adverse effects on the operation of the existing tunnel.

Funder

National Natural Science Foundation of China

Publisher

MDPI AG

Subject

General Mathematics,Engineering (miscellaneous),Computer Science (miscellaneous)

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3