Author:
Jiang Xin,Nan Guoliang,Liu Hao,Guo Zhimin,Zeng Qingshan,Jin Yang
Abstract
An optimal sizing model of the battery energy storage system (BESS) for large-scale wind farm adapting to the scheduling plan is proposed in this paper. Based on the analysis of the variability and uncertainty of wind output, the cost of auxiliary services of systems that are eased by BESS is quantized and the constraints of BESS accounting for the effect of wind power on system dispatching are proposed. Aiming to maximum the benefits of wind-storage union system, an optimal capacity model considering BESS investment costs, wind curtailment saving, and auxiliary services compensation is established. What’s more, the effect of irregular charge/discharge process on the life cycle of BESS is considered into the optimal model by introducing an equivalent loss of the cycle life. Finally, based on the typical data of a systems, results show that auxiliary services compensation can encourage wind farm configuration BESS effectively. Various sensitivity analyses are performed to assess the effect of the auxiliary services compensation, on-grid price of wind power, investment cost of BESS, cycle life of BESS, and wind uncertainty reserve level of BESS on this optimal capacity.
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
24 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献