Significant Factors Causing Delay in the Cambodian Construction Industry

Author:

Tahmasebinia Faham,Song Vicheth

Abstract

The construction sector is one of the essential sectors in the world; it aids in developing all the countries in the world because it is the foundation of other industries. However, delays in construction projects are a common issue that has been found in all global construction projects. This research aims to understand the issues that lead to construction project delay, ranking the ten most significant causes of construction delay and providing instructive recommendations to overcome the discussed issue in the construction sector. The first ten substantial delay factors are poor planning and scheduling, late delivery of material, change of scope by owners during the construction phase, poor site management and supervision, insufficient finances of contractors or sub-contractors, lack of experience of the contractor’s team, delay due to design error, low productivity of labor, delay in process payment by the owner, and delay in the decision making of the owners and consultants. Subsequently, it was discovered that the contractors, consultants, and owners must cooperate and collaborate in all aspects to improve the construction industry.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3