Abstract
Sedimentation is an important issue that has been studied for the watershed of reservoirs, since it increases operational costs of hydropower installations, reduces the life expectancy, and compromises the generation capacity due to volume reduction. This work addresses the implementation of Chivor’s Life Extension Project (CLEP), developed in order to extend the life of La Esmeralda reservoir, which is used for power generation in Colombia. Sediment dynamics studies are first described and connected to the need of the AES Corporation to extend the life expectancy of the Chivor Hydropower Project. The geotechnical and hydraulic designs are described and the main considerations and tools for the execution of such a project are addressed. The construction of the new intake system was developed under favorable geomorphological, geological, and hydrogeological conditions, and the project is being developed without affecting the current operation. Such an innovative project is the first of its class in Colombia and goes from studies of sediment transport and sediment management strategies in the watershed to the design and construction of new intakes, in order to extend the life of an existing 1000-MW (6% of Colombia’s demand) powerplant for 50 more years, contributing to a sustainable energy supply for the future.
Subject
Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry
Reference42 articles.
1. World Population Prospects 2019: Highlights,2019
2. World Energy Outlook 2019,2019
3. The Sustainable Development Goals Report 2020,2020
4. Sustainable Energy for All 2017—Progress Toward Sustainable Energy (Summary),2017
5. Assessment and prediction for service life of water resources and hydropower engineering
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献