The Optimization of Water Storage Timing in Upper Yangtze Reservoirs Affected by Water Transfer Projects

Author:

Wen Fan1,Guan Wenhai2,Yang Mingxiang13,Cao Jixue2,Zou Yibo2,Liu Xuan14,Wang Hejia1,Dong Ningpeng135ORCID

Affiliation:

1. State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100038, China

2. China Three Gorges Corporation, Yichang 443000, China

3. Cooperative Innovation Center for Water Safety & Hydro Science, Hohai University, Nanjing 210098, China

4. College of Civil Engineering, Tianjin University, Tianjin 300354, China

5. State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Hohai University, Nanjing 210098, China

Abstract

To alleviate regional disparities in water resource distribution and consequent scarcity, China has initiated and planned a series of inter-basin water transfer projects using the Yangtze River Basin as the source. These projects are expected to divert approximately 33.4 billion cubic meters of water annually from the Yangtze River Basin. The implementation of these water transfer projects will inevitably alter the hydrological conditions in the upper reaches of the Yangtze River, impacting the reservoir storage strategies of cascading hydroelectric stations under current end-of-flood-season operational plans. This study quantitatively assesses the impact of water transfer projects on end-of-flood-season reservoir storage in cascading systems using the reservoir fullness ratio as an indicator. Employing reservoir storage analysis models, optimization techniques, and flood risk assessment methods, we simulated reservoir storage processes to evaluate associated flood risks and derive an optimized timing strategy for cascading reservoir storage. The results indicate that advancing the reservoir filling schedule by five days for both the Baihetan and Three Gorges dams can offset the adverse impacts of water transfer projects on reservoir storage efficiency. This adjustment restores the reservoir fullness ratio to levels observed in scenarios without water transfers while still meeting flood control requirements. After optimizing the timing of reservoir filling, the electricity generation capacity for the Baihetan and Three Gorges dams increased by 1.357 and 3.183 billion kWh, respectively, under non-transfer scenarios. In water transfer scenarios, the electricity generation for the Baihetan and Three Gorges dams increased by 1.48 and 2.759 billion kWh, respectively. By optimizing reservoir filling schedules, we not only improved the reservoir fullness ratio but also enhanced the electricity generation efficiency of the cascading systems, offering valuable insights for future reservoir operation optimization.

Funder

Research Programme of the China Three Gorges Corporation “Impact of trans-basin water diversion on the Yangtze River Basin and its adaptation”

Research Programme of the Kunming Engineering Corporation Limited

Key Research and Development Programme of Yunnan

Science and Technology Plan Project of Yunnan Provincial Department of Science and Technology

Belt and Road Special Foundation of the State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering

Publisher

MDPI AG

Subject

Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3