Mechanical Properties and Influencing Factors of Shield Cutting Existing Station Supporting Piles
-
Published:2023-07-28
Issue:15
Volume:15
Page:11699
-
ISSN:2071-1050
-
Container-title:Sustainability
-
language:en
-
Short-container-title:Sustainability
Author:
Guan Xiaoming1ORCID,
Liu Zeliang1,
Xu Huawei1,
Liu Yanchun1,
Ling Xianzhang1,
Ding Hao2,
Ren Sihao2,
Lu Ruiquan3,
Yu Ke2,
Miao Jijun1
Affiliation:
1. School of Civil Engineering, Qingdao University of Technology, Qingdao 266033, China
2. The Fourth Construction Co., Ltd. of China Construction Eighth Engineering Division, Qingdao 266000, China
3. Qingdao Metro Group Co., Ltd., Qingdao 266071, China
Abstract
Based on the shield-cutting existing station supporting piles project of Zhengzhou metro line 6, the process and mechanism of concrete in the process of pile cutting were analyzed by establishing a three-dimensional model of concrete with a cutter. The magnitude and variation rules of cutting force, penetration force, and tangential force were explored. The variation rules of cutting force with four factors of cutting speed, cutting depth, cutter width, and tool rake angle were explored. The correctness of the numerical model and results were verified by the theoretical analysis method. Finally, the significance of the influencing factors of pile cutting was studied by means of range analysis and variance analysis using the orthogonal test method, and the cutter parameters were optimized. The cutting mechanism is that the front concrete is compressed and crushed to produce a dense core. The cutting force increases rapidly to its maximum value in a short time during the cutting process. The cutting force is always larger than the penetration force and tangential force. The cutter contact force basically remains unchanged with the change in cutting speed; however, it increases with the increase in cutting depth and cutter width. The significant order of the three influencing factors is cutting depth, cutter width, and rake angle. It is suggested that the cutting depth be adjusted preferentially, followed by the cutter width. And the principle of rake angle should be considered last.
Funder
National Natural Science Foundation of China
Natural Science Foundation of Shandong Province
Demonstration Project of Benefiting People with Science and Technology of Qingdao
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction
Reference28 articles.
1. Rock-Breaking Laws of Disc Cutters with Different Height Differences in Hard Rock Strata;Lu;Adv. Civ. Eng.,2022
2. Adaptability of the Cutter-Head of the Earth Pressure Balance (EPB) Shield Machine in Water-Rich Sandy and Cobble Strata: A Case Study;Wan;Adv. Civ. Eng.,2020
3. Full-Scale Laboratory Test of Cutting Large-Diameter Piles Directly by Shield Cutterhead;Wang;Adv. Civ. Eng.,2022
4. Study on shield cutting parameters when cutting big diameter piles;Chen;China Civ. Eng. J.,2016
5. Wang, X.Y., and Yuan, D.J. (2022). Research on the Interaction between the Pile and Shield Machine in the Process of Cutting a Reinforced Concrete Pile Foundation. Appl. Sci., 13.