Abstract
Increasing emissions from mining areas and a high global warming potential of methane have caused gas management to become a vital challenge. At the same time, it provides the opportunity to obtain economic benefits. In addition, the use of combined heat and power (CHP) in the case of coalbed methane combustion enables much more efficient use of this fuel. The article analyses the possibility of electricity production using gas engines fueled with methane captured from the Budryk coal mine in Poland. The basic issue concerning the energy production from coalbed methane is the continuity of supply, which is to ensure the required amount and concentration of the gas mixture for combustion. Hence, the reliability of supply for electricity production is of key importance. The analysis included the basic characterization of both the daily and annual methane capture by the mine’s methane drainage system, as well as the development of predictive models to determine electricity production based on hourly capture and time parameters. To forecast electricity production, predictive models that are based on five parameters have been adopted. Models were prepared based on three time variables, i.e., month, day, hour, and two values from the gas drainage system-capture and concentration of the methane. For this purpose, artificial neural networks with different properties were tested. The developed models have a high value of correlation coefficient. but showed deviations concerning the very low values persisting for a short time. The study shows that electricity production forecasting is possible, but it requires data on many variables that directly affect the production capacity of the system.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献